BR 21T ZDV Engineers Wagon TOPS Bauxite - LDB311717 - Exclusive 31-Run2British Railways 21 Ton Coal 21VB MDV Wagon ZDV no. LDB311717 was noted as being used by the Electrification Engineers for collecting scrap metal during the latter stages of the Birmingham Cross City Electrification scheme between Lichfield and Ridditch, in the period between May 1991 (when the first electrification mast was planted) and June 1993 (when load bank testing was completed). Our model faithfully captures the worn look of this long lived
Interior Coach lighting with Stay-Alive Capacitor
Gearing arranged so locomotive can achieve minimum scale top speed of 125 mph (200 km/h)
66004 was treated to its eye catching ‘Climate Hero’ livery during 2021 as part of a program to promote freight on rail by owners DB
A total of forty of these striking vehicles were built in three batches for the Nuclear Decommissioning Authority (NDA) by WH Davis in the UK between 2014 and 2019
Two P1 style Chaldrons and an S&DR style Chaldron
High Performance Traction features
* Sprung metal buffers and dummy instanter couplings
Standard sleeper coach 15310
with these 6 Coaches
later receiving an experimental uprated 2
Fully detailed Lighting Pack
DRS multiple working socket